淮阴三站变频变速优化运行的分解-动态规划聚合法
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家“十一五”科技支撑计划资助项目(2006BAB04A03);国家自然科学基金资助项目(60974099);江苏省属高校自然科学重大项目(09KJA570001);教育部博士点基金项目(20093250110002);2010年江苏省普通高校研究生科研创新计划项目资助


Optimization on variable speed operation with VFD for No.3 Huaiyin pumping station based on decomposition-dynamic programming aggregation method
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以泵站多机组变频变速运行日耗电费用最小为目标,构造泵站多机组变频变速日优化运行数学模型。考虑变频装置效率随机组转速变化情况,采用大系统分解-动态规划聚合方法求解。先以泵站日提水耗电费用最小为目标,机组提水量为协调变量,将该模型分解为若干个单机组变频变速日优化运行子模型;再以各机组提水量为决策变量,泵站提水量的离散值为状态变量,构造聚合模型,二者均采用动态规划方法求解。该方法对求解不同型号泵机组或各机组同型号但性能存在差异的泵站变频变速最优化运行问题同样适用。以南水北调东线第三梯级泵站淮阴三站运行为例,获得了一系列优化成果。

    Abstract:

    The mathematical model of optimal daily operation with variable speed for multiple pump units in single pumping station was constructed by taking the minimal daily electric cost as objective function. Considering the efficiency of variable frequency drive (VFD) varied with the unit rotational speed, the decomposition-dynamic programming aggregation method was applied to solve the model above. Taking minimal daily electric cost as objective function, the water quantity pumped by units as coordinated variable, this model was decomposed into several sub-models of daily optimal operation with variable speed for single pump unit. The constructed aggregation model took water quantity pumped by each pump unit as decision variable, the discrete values of water quantity pumped by pumping station as state variable. Both sub-model and aggregation model were solved by means of dynamic programming method. The decomposition-dynamic programming aggregation method could solve the optimal variable speed operation issues for multiple pump units with different types or the units of the same type with performance differences in single pumping station. Through the study on the operation of No.3 Huaiyin Pumping Station which is the third stage pumping station of South-to-North Water Diversion Project in China, a series of optimization results were obtained.

    参考文献
    相似文献
    引证文献
引用本文

龚 懿,程吉林,张仁田,张礼华.淮阴三站变频变速优化运行的分解-动态规划聚合法[J].农业工程学报,2011,27(3):79-83.

Gong Yi, Cheng Jilin, Zhang Rentian, Zhang Lihua. Optimization on variable speed operation with VFD for No.3 Huaiyin pumping station based on decomposition-dynamic programming aggregation method[J]. Transactions of the Chinese Society of Agricultural Engineering (Transactions of the CSAE),2011,27(3):79-83.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-07-30
  • 最后修改日期:2011-03-15
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码
您是第位访问者
ICP:京ICP备06025802号-3
农业工程学报 ® 2026 版权所有
技术支持:北京勤云科技发展有限公司